|
Out of approx. 8829 MTs of waste about 7784 MT will be non-incinerable waste and approx. 1045 MT will be incinerable waste for which Incinerator will be installed at a cost of Rs. 6 crores. It is envisaged that by the time the facility will become fully operative about 18000 NT waste shall be made available to achieve the break even point. |